The other 'big' thing was to replace the horrible concrete expanse that was our drive, which we did in a joint project with our neighbour. They turned up with a tiny pneumatic drill on day 1 which was no match for it as it turned out to be 2 foot deep and reinforced!!!!! They burnt out 2 in 2 hours and gave up.
They came back on day 2 with some serious equipment to break it up, and the day ended with this scene...
Day 3 they levelled it off and started laying out the borders and recasting the second post, day 4 they made decent progess laying the main blocks at the front, and day 5 they had finished most of the front.
And here is the finished result (on our side). They finished up with next door the next day. It looks so much better, I am very pleased with it.